Use Case - Aerial mapping for oil & gas pipeline corridor
Pt. Byte Geo Solusi / IndonesiaThe setting
Client: Joint operating body pertamina – Talisman Gas Plant
Region: Jambi – South Sumatra – Indonesia
Project:
Aerial mapping for oil & gas pipelines corridor
The use of the Quantum-Systems Trinity in the oil and gas project helps us to provide real time data for pipelines that are located in remote areas. Simple handling and uncomplicated mission planning help to achieve a perfect result in the shortest time possible.
Facts & Figures

Altitude:
210 m AGL

Flight time:
36 min

GSD:
6,5 cm / 2.55 in

Camera:
Sony UMC-R10C 16mm

Area:
1 km2 / 100 ha

Wind:
6 m/s / 11.7 kn

Pictures:
328

Overlap:
Side 80 %
Forward 70 %
How can we help you with your application? Send us a message!
We'd love to hear from you!Thank you for your interest in our products. Given the number of inquiries, please note that the screening and evaluation of your inquiry will be conducted on the basis of the information provided. You are therefore kindly requested to provide complete and accurate information pertaining, but not limited to envisaged mission profile(s), geographical area of operation, end-user information, choice of sensor(s), and other relevant operational requirements in the respective fields.
A reply to an inquiry can only be expected if the required fields in the above form are answered. We will reply as soon as reasonably possible and kindly ask for your understanding.
For more information on how Quantum-Systems processes your data, please see our privacy policy:
https://www.quantum-systems.com/privacy-policy/